|
1. Segment |
- Organization of the Course – Introduction to the
AA case-study
Read Chapter 1 in Douglas
- Introduction to the HDA case-study
Read Chapter 2, 3
- Synthesis and Analysis of Process Design -
Hierarchical Approach
Read Chapters 4 |
|
2. Segment |
· Design
input information; Batch versus continuous, Basic process selection
Read Chapter 5 in Douglas
·
Input-output structure of the flowsheet
· Input
Output structure – Continued
Read Chapter 6 |
|
3. Segment |
· Recycle
Structure of the Flowsheet (HDA)
First progress report due 9/8/99:
The Input Output Structure of the Acetic Anhydride Plant
· Recycle
Structure - Costing of Furnace
· Recycle
Structure of the Flowsheet – AA |
|
4. Segment |
· Recycle
Structure of the Flowsheet – AA
Industrial Coaching and
Consulting |
|
5. Segment |
· Recycle
Structure of the Flowsheet -
Material and Energy balances
· Recycle
Structure of the Flowsheet – AA
·
Engineering Economics – Estimating capital and operating cost
Second progress report due 9/24/99
The Recycle Structure of the Acetic Anhydride Plant |
|
6. Segment |
· General
Structure of the Separation System
· The
Design of the Separation System - Part I
· The
Design of the Separation System – Part II |
|
7. Segment |
· The
Design of the Separation System – Part III
· The
Design of the Separation System – Part IV
·
Engineering Economics Engineering Economics |
|
8. Segment |
Industrial Coaching and
Consulting |
|
9. Segment |
·
Overview Separation System of Anhydride Plant
·
Property Prediction for the Design of Separation Systems
·
Property Prediction for the Design of Separation Systems
Third progress report due 10/29/99
The Separation Structure of the Acetic Anhydride Plant |
|
10. Segment |
· Team
Presentations:
· Team
Presentations: |
|
11. Segment |
· Team
Presentations:
· Cost
Diagrams for Process Designs
· Energy
Integration I |
|
12. Segment |
· Energy
Integration II
·
Sensitivity Analysis
· Final
Report Requirements |
|
13. Segment |
· Process
Optimization
· Process
Optimization
· Process
Optimization |
|
14. Segment |
Industrial Coaching and Consulting |
|
15. Segment |
·
Discussions in support of the Final Reports and Review
· Outlook
Senior Design II
Fourth and Final progress report due
12/4/98
The Acetic Anhydride Plant |