1. Segment
|
-
Organization of the Course – Introduction to the AA case-study
Read Chapter 1 in Douglas
-
Introduction to the HDA case-study
Read Chapter 2, 3
-
Synthesis and Analysis of Process Design - Hierarchical Approach
Read Chapters 4
|
|
2. Segment
|
-
Design input information; Batch versus continuous, Basic process selection
Read Chapter 5 in Douglas
-
Input-output structure of the flowsheet
-
Input Output structure – Continued
Read Chapter 6
|
|
3. Segment
|
-
Recycle Structure of the Flowsheet (HDA)
First progress report due 9/8/2000:
The Input Output Structure of the Acetic Anhydride Plant
-
Recycle Structure - Costing of Furnace
-
Recycle Structure of the Flowsheet – AA
|
|
4. Segment
|
-
Recycle Structure of the Flowsheet – AA
Industrial Coaching and Consulting
|
|
5. Segment
|
-
Recycle Structure of the Flowsheet -
Material and Energy balances
-
Recycle Structure of the Flowsheet – AA
-
Engineering Economics – Estimating capital and operating cost
Second progress report due 9/29/2000
The Recycle Structure of the Acetic Anhydride Plant
|
|
6. Segment
|
-
General Structure of the Separation System
-
The Design of the Separation System - Part I
-
The Design of the Separation System – Part II
|
|
7. Segment
|
-
The Design of the Separation System – Part III
-
The Design of the Separation System – Part IV
-
Engineering Economics Engineering Economics
|
|
8. Segment
|
Industrial Coaching and Consulting
|
|
9. Segment
|
Overview Separation System of Anhydride Plant
Property Prediction for the Design of Separation Systems
Property Prediction for the Design of Separation Systems
Third progress report due 10/29/99
The Separation Structure of the Acetic Anhydride Plant |
|
10. Segment
|
Team Presentations:
Team Presentations:
|
|
11. Segment
|
Team Presentations:
Cost Diagrams for Process Designs
Energy Integration I
|
|
12. Segment
|
Energy Integration II
Sensitivity Analysis
Final Report Requirements
|
|
13. Segment
|
Process Optimization
Process Optimization
Process Optimization
|
|
14. Segment
|
Industrial Coaching and Consulting |
|
15. Segment
|
Discussions in support of the Final Reports and Review
Outlook Senior Design II
Fourth and Final progress report due 12/3/99
The Acetic Anhydride Plant
|